Jake White worked on the project at Weald House during his employment at Morgan Carn Architects. The original concept Architects; Ecotecture Ltd gained the original planning permission in 2016 for a Para 55 (now 80). The planning permission was later revisited by MCA to provide additional utility space at lower ground floor and a secondary entrance to the dwelling. MCA developed the technical package in conjunction with Beattie Passive with all building elements significantly exceeding Passivhaus requirements.
Project stage: Complete
Work Stages: 3-5
Location: Keymer, Sussex